Project to include more than 1,000 feet of track, drainage enhancements and connection to an industrial lead track

TGB Group has contracted with Transwestern Asset Services to design a rail spur as part of a track design project for a large international paper and packaging manufacturing client.  The project is located in the Railhead Industrial Park in north Fort Worth and will be connected to the Burlington Northern Santa Fe Railway.

Design for the project was completed in January 2019.  The design included drainage enhancements to the existing site, more than 1,000 feet of track, a concrete road crossing and connection to an existing BNSF-served industrial lead track.  Our track design project team worked with the railroad to fast-track the approval to meet our client’s deadline.

TGB obtained pricing and awarded the contract to New York- and Texas-based RailWorks, which is responsible for track construction, and Shackelford Construction & Hauling, LLC, of Yazoo City, Miss., which will manage civil construction.  Current plans call for construction of the track design project to start in late February or early March 2019.

In addition to providing comprehensive design services for this track design project in Texas, TGB personnel will be present at the site during construction to oversee the project, making sure it is built according to our client’s specifications.

About Railhead Industrial Park

Railhead Industrial Park is the only industrial complex that offers dual rail service in north Texas.  The west side of the park is bordered by Union Pacific Railroad; Burlington Northern Santa Fe and a primary NAFTA operations yard can be directly accessed on the east side of the park.  When completely built, the park will cover 583.5 acres with about 10 million square feet of office, industrial and warehouse space.

To learn more about this track design project in the Railhead area of Fort Worth, Texas, please contact:

Mike Murphy, president, TGB Group: (832) 748-7603