Where we are in this multifaceted project

TGB Group has completed surveying and engineering work for the Big Spring Mahon-Wrinkle Industrial Park Transload Yard, a project that began earlier in the year.

We are currently working on the construction of the transload yard with Big Spring Economic Development Corporation. Railworks Track Systems and DIFFCO, LLC were the selected rail and civil contractors for the project for which TGB Group is providing construction management services. So far, we have completed the ditching and surfacing and are beginning to fill the ditches with riprap. TGB team member Logan Ortiz P.E. is performing construction observation duties for the project. He is on-site at the industrial park every week, ensuring that the contractors build everything according to client-approved engineering documents.

Riprap

Riprap is essentially chunks of rock approximately one to two feet in diameter that are used to prevent erosion. Rocks typically used as riprap include granite, limestone and sometimes concrete. Riprap is particularly important to fill ditches near railroad yards to prevent water from eventually eroding the dirt beneath the track. If erosion is allowed to happen, a void will develop within the dirt under the track. As trains pass over this void, the railroad track will bend and “pump” into the dirt. The only way to fix this void is to have a railroad contractor come and fill in the void, which is an expensive and time-consuming process.

Drone Footage

Jake Cooper, TGB’s business development manager, took some drone footage of the construction in the transload yard. The first video is footage for the entire project from the south end, to the north end.

This second video is closer footage from about the middle, to the north end.